Friday, August 17, 2012

Pants

Whilst back doors are being fitted, vegetables constantly getting preserved, and even a stove gradually getting built ready for winter, surely the big news is the outdoor toilet on the move!
Broken down like a kit-form, hoisted onto two wheelbarrows, a struggled journey to it's new, more privat 'e' location. 
Now, sitting within spitting distance of where it will stay standing, an area is being excavated ready for all the deposits.
A new seat to be fitted to separate all the ones and twos, and utilized in an organic way..
Once put back together a beautiful view from the door onto open countryside to tempt the sitter to stay longer.
The masterplan will continue with the production of a second utility built next door. Each to have a 6 month use throughout the year depending on quantity and quality control of course!

No comments:

Post a Comment

Facebook

https://www.airbnb.com/rooms/2079083?guests=1&s=TJUe